Environment Agency North Hub Framework

Named as a primary supplier to deliver Lot 3 works to the Environment Agency under the AOMR 3 year framework. Works include vegetation management, tree management and flood prevention works across Cumbria & Lancashire, Greater Manchester, Cheshire and Yorkshire
Principle Contractor
Environment Agency
Location
Cumbria and Lancashire, Greater Manchester, Cheshire and Yorkshire
Programme
3 Year (+1) Framework April 2024 - 2028

Lowther were named as a primary supplier to the Environment Agency to deliver works across three regional hubs: Cumbria & Lancashire, Greater Manchester & Cheshire and Yorkshire in 2024. Delivering routine vegetation management (both in channel and out of channel) and tree management.

Overview

The framework covers waterway and vegetation management across Cumbria and Lancashire, Greater Manchester, Cheshire and Yorkshire. As primary supplier for the region, Lowther deliver a wide range of activities including grass and vegetation management, tree management, flood prevention works and invasive weed control. Protection of the aquatic environment is central to all planning and operations across the contract.

Works Undertaken

Our approach to managing sensitive aquatic and riparian environments is supported by the deployment of specialist plant and equipment selected specifically for the conditions and constraints of each site. This enables access to challenging terrain, including steep gradients, soft ground, and environmentally sensitive areas, while minimising disturbance to surrounding habitats.

The use of low-impact, specialist equipment allows vegetation management, flood resilience, and environmental maintenance works to be undertaken safely and efficiently, reducing the risk of damage to sensitive flora, fauna, watercourses, and riparian zones. This capability has been developed through decades of working within highly regulated environments, where environmental protection, operational efficiency, and safe delivery are critical to project success.

Related Projects

FENCING AND BARRIER SYSTEMS Security fencing at the Walney Extension onshore substation, Heysham

Walney Extension Offshore Wind Farm

Lowther were appointed by Amey Utility Services Ltd to design and install the perimeter and internal security fencing package for the onshore substation serving the Walney Extension offshore wind farm near Heysham in Lancashire.

Read Case Study
FENCING AND BARRIER SYSTEMS Perimeter security fencing at Triton Knoll onshore substation, Lincolnshire

Triton Knoll Offshore Wind Farm

Lowther were appointed by Siemens Transmission and Distribution Ltd to design, supply and install the full CAT2 perimeter security fencing package at the Triton Knoll offshore wind farm onshore substation in Lincolnshire.